Skip to content
SLC

Labor Cost Calculator

Calculate the real cost of your time for making, packing, listing, or fulfilling products — including overhead and supplies, spread across units.

Enter every amount in the same currency. This selector only changes the symbol shown — it does not convert exchange rates.

0–59

Whole number, 1 or more

Total cost per unit

$3.50

Labor + overhead

Labor cost per unit

$3.00

Total labor cost

$30.00

1.50 hours × $20.00

Total cost (batch)

$35.00

1.50 hours × $20.00/hr = $30.00 labor. Spread across 10 units, that's $3.00 labor per unit ($3.50 with overhead).

Short example

1h 30m × $20.00/hr = $30.00 labor. Across 10 units, that's $3.00 labor per unit — $3.50 with $5.00 of overhead spread across the batch.

This is the cost of time at the rate you enter. It does not include employer payroll costs such as payroll taxes or benefits.

All calculations are estimates based on average platform fees. Real profits may vary depending on category, ads, and shipping.

Free worksheet for your next step

Turn this calculator result into a plan with a matching worksheet, checklist, or printable resource.

  • WorkbookGeneral

    Seller Profit Workbook

    A printable workbook to work out revenue, refunds, expenses, selling fees and profit, with profit margin and break-even worksheets, product performance tracking, monthly, quarterly and annual reviews, and a 90-day profit improvement plan.

  • PlannerBusiness Planning

    Small Business Budget Planner

    A printable, fill-in-by-hand workbook for monthly business budgeting: revenue planning and tracking, fixed and variable expenses, marketing and subscription costs, tax and savings reserve planning, projected business profit, monthly budget-versus-actual reviews, an annual summary and next steps. Reserve transfers are kept separate from profit as allocations, not extra expenses.

How to use this calculator

  1. Enter your numbers in each field above — the calculator updates instantly as you type, so there's nothing to submit.
  2. Use your real figures when you have them, or sensible estimates while you're planning. If a field doesn't apply, leave it at zero.
  3. Compare the results, then change one input at a time to see how each lever (price, cost, fees, volume) moves the outcome.

Formula

Total hours = Hours + Minutes ÷ 60 · Labor cost = Hours × Rate · Per unit = (Labor + Overhead) ÷ Units · Total = Labor + Overhead

Worked example

1 hour 30 minutes at $20/hr, 10 units, $5 overhead.

  1. Total hours = 1.5
  2. Labor = 1.5 × 20 = $30
  3. Per unit = 30 ÷ 10 = $3
  4. With overhead = ($30 + $5) ÷ 10 = $3.50

Answer: $3/unit labor; $3.50/unit including overhead

How it works

If you'd have to pay someone to do this task, that's the real cost — even when you do it yourself. Pricing that doesn't include labor eventually burns you out.

How to interpret your results

  • Dollar values are shown per sale, per order, or per item unless a result is explicitly labelled monthly, weekly, or daily.
  • Percentages (margin, ROI, conversion rate) are easier to compare across products and price points than raw dollars — use them when you benchmark.
  • A positive result means you're ahead after the costs and fees you entered. A negative result means the current numbers don't work — change a lever (raise price, cut a cost, lower ad spend) and recalculate.
  • Treat the output as a planning estimate, not a guarantee. Fees, taxes, and conversion rates shift over time — re-run the numbers whenever a key input changes.

Common mistakes

  • Charging $0 for your own time.
  • Rounding time down — track actual minutes.
  • Forgetting to spread overhead like tool wear, workspace, and supplies.

Go deeper with plain-English guides on the same topic.

FAQ

What hourly rate should I use?
At minimum, your local living wage. For skilled work, use what you'd charge a client — this is 'what if I hired myself'.
Do I count listing and admin time?
Yes — spread it across the products it supports. It's real time and it grows with volume.
Why won't it accept 90 minutes or half a unit?
Minutes are the extra time beyond full hours, so they must be 0–59 (enter 90 minutes as 1 hour 30 minutes). Units must be a whole number of 1 or more. Negative or non-numeric values show a message instead of being treated as zero.
Is this the same as payroll cost?
No. It values time at the rate you enter. Employer payroll taxes, benefits and similar costs are not included.

Why trust this calculator?

This tool uses standard mathematical formulas and commonly accepted calculation methods, shown openly in the Formula section above so you can verify the math yourself. Results are estimates based on the information you enter and do not account for every individual circumstance. For important financial, tax, legal, medical, or business decisions, please double-check with a qualified professional before acting on the numbers.

What to calculate next

Once your time has a cost, fold it into the full product cost, then price the item so that labour is actually paid.

Related calculators

You may also find these tools helpful.